diff options
author | Jonas Gorski <jogo@openwrt.org> | 2015-05-21 19:32:16 +0000 |
---|---|---|
committer | Jonas Gorski <jogo@openwrt.org> | 2015-05-21 19:32:16 +0000 |
commit | 072937888e133f5e97fd05a7496eaf7eeae04079 (patch) | |
tree | 0feb87d5e07d42b118e3231b8261a2610b364c83 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 4bb7b2186ef9c56655c0bd035ae2740888c751a9 (diff) | |
download | upstream-072937888e133f5e97fd05a7496eaf7eeae04079.tar.gz upstream-072937888e133f5e97fd05a7496eaf7eeae04079.tar.bz2 upstream-072937888e133f5e97fd05a7496eaf7eeae04079.zip |
mac80211: make it work with 3.18.12+
3.18.12 backported 61ada528dea028331e99e8ceaed87c683ad25de2 ("sched/wait:
Provide infrastructure to deal with nested blocking") from 3.19, causing
the following error on load:
[ 13.588000] compat: exports duplicate symbol woken_wake_function (owned by kernel)
Fix this by guarding it with a check for 3.18.11 or earlier instead of
3.19.
Signed-off-by: Jonas Gorski <jogo@openwrt.org>
SVN-Revision: 45710
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions