diff options
author | Sungbo Eo <mans0n@gorani.run> | 2020-03-05 22:57:29 +0900 |
---|---|---|
committer | Adrian Schmutzler <freifunk@adrianschmutzler.de> | 2020-03-11 19:40:03 +0100 |
commit | 228bb84744589efa38ebddd7a75bf97de6789aeb (patch) | |
tree | 0b9ed1ececdc0dda9b3c72885897b23cf6332b4f /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 95c1fce821c37d5afcd84df92b58c5ae184f8bcd (diff) | |
download | upstream-228bb84744589efa38ebddd7a75bf97de6789aeb.tar.gz upstream-228bb84744589efa38ebddd7a75bf97de6789aeb.tar.bz2 upstream-228bb84744589efa38ebddd7a75bf97de6789aeb.zip |
kernel: make kmod-ata-core selected by dependent modulesupstreamless-old-master
Currently kmod-ata-* will not get into images unless kmod-ata-core is added to
DEVICE_PACKAGES as well. By changing the dependencies from "depends on" to
"select", we do not have the issue anymore.
Furthermore, we can remove most occurrences of the package from DEVICE_PACKAGES
and similar variables, as it is now pulled by dependent modules such as:
- kmod-ata-ahci
- kmod-ata-ahci-mtk
- kmod-ata-sunxi
While at it, use AddDepends/ata for kmod-ata-pdc202xx-old.
Signed-off-by: Sungbo Eo <mans0n@gorani.run>
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions