diff options
author | Felix Fietkau <nbd@openwrt.org> | 2015-09-11 16:35:32 +0000 |
---|---|---|
committer | Felix Fietkau <nbd@openwrt.org> | 2015-09-11 16:35:32 +0000 |
commit | 9da3a6283995f9168de3fc54e4e3859caa840015 (patch) | |
tree | af1510123c09c230a302e24cd76f9ff20569d38a /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | ced2b641e2f19f3ce8bd6c21055dcf77dca5099a (diff) | |
download | upstream-9da3a6283995f9168de3fc54e4e3859caa840015.tar.gz upstream-9da3a6283995f9168de3fc54e4e3859caa840015.tar.bz2 upstream-9da3a6283995f9168de3fc54e4e3859caa840015.zip |
ugps: fix filename to eliminate build problems
due to ordering PKG_SOURCE_VERSION is not defined leading
to a filename "ugps-.tar.bz2"
This errors out when an older version is in the dl/ dir (or LOCALMIRROR)
fix order and use uhttpd file naming scheme to visibly include date
Signed-off-by: Dirk Neukirchen <dirkneukirchen@web.de>
SVN-Revision: 46868
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions