diff options
author | John Crispin <john@openwrt.org> | 2015-02-13 07:29:03 +0000 |
---|---|---|
committer | John Crispin <john@openwrt.org> | 2015-02-13 07:29:03 +0000 |
commit | bd5635770c9042420c85f06bca1efb0ed3234889 (patch) | |
tree | 55b99d08c9c0a3612f0f6d58f6a278b93bc8a073 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 235a83cdfe68d65a0857d82bca9089a1f39b976c (diff) | |
download | upstream-bd5635770c9042420c85f06bca1efb0ed3234889.tar.gz upstream-bd5635770c9042420c85f06bca1efb0ed3234889.tar.bz2 upstream-bd5635770c9042420c85f06bca1efb0ed3234889.zip |
ar71xx: Add user-space support for TP-Link MR12U v1
This patch adds user-space support for the TL-MR12U board based on the mr13u patches.
Signed-off-by: Daniel Petre <daniel.petre@gmail.com>
SVN-Revision: 44426
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions