diff options
author | Felix Fietkau <nbd@openwrt.org> | 2015-09-02 09:26:22 +0000 |
---|---|---|
committer | Felix Fietkau <nbd@openwrt.org> | 2015-09-02 09:26:22 +0000 |
commit | f7fbc745a150335783402b21425bc3b9ab2ffc4a (patch) | |
tree | 224e0925e5c19e47a052179428763c68da095da6 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 7e05e4ed13baed834be25c00a13756fcfa0c1850 (diff) | |
download | upstream-15.05.tar.gz upstream-15.05.tar.bz2 upstream-15.05.zip |
ramips: fix devicetree corruption with some boot loaders if the caches are not ready at bootv15.05
Signed-off-by: John Crispin <blogic@openwrt.org>
Backport of r46766
git-svn-id: svn://svn.openwrt.org/openwrt/branches/chaos_calmer@46767 3c298f89-4303-0410-b956-a3cf2f4a3e73
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions